The Waterfall Model: When It Still Works

The waterfall model runs a software project in fixed phases, each finished before the next starts. It fits stable requirements and costly late changes best.

Hertiv engineering teamReviewed by a senior engineer
7 min read
The Waterfall Model: When It Still Works
On this page

Short answer

The waterfall model is a way of running a software project in a sequence of fixed phases, requirements, design, building, testing and delivery, where each phase finishes before the next starts. It works best when requirements are stable, the technology is known and late changes are expensive, such as in regulated software.

What is the waterfall model?

The waterfall model is a way of running a software project in a sequence of fixed phases, where each phase finishes before the next one starts. The phases run in one direction, like water falling down steps: requirements, design, building, testing and delivery, with no going back to an earlier step without starting a new round.

The model suits projects where the requirements are known up front and change rarely. A payroll system for a known tax year, a compliance report with a fixed format, or a hardware-linked system with set specifications all fit, because the team can write the requirements down before any code exists.

The key idea is that decisions are made early and written down. The requirements document describes what the software must do, the design document describes how it will do it, and the code follows the design. Testing then checks the finished software against the original requirements.

For the wider set of phases, the software development life cycle explained covers the same stages and how they fit together in any method, not only waterfall.

What are the phases of the waterfall model?

The classic waterfall has five phases, and each one produces a document or a working result that the next phase depends on. The table lists each phase, what it produces and what can go wrong if it is rushed.

PhaseWhat it producesRisk if rushed
RequirementsA written list of what the software must doMissing needs found too late
DesignArchitecture, screens and data modelCode that cannot be changed cheaply
ImplementationWorking code for each partParts that do not fit together
TestingChecked software against the requirementsBugs found after release
DeploymentSoftware live with usersUsers who were never consulted

Requirements are the phase that matters most. If a need is missing from the document, the design will not cover it, the code will not build it, and testing will not check it. The gap only appears when users see the finished software, which is the most expensive time to find it.

Design follows from requirements and fixes the structure before code starts: which parts exist, how they talk to each other and what data they hold. A good design document lets two developers build separate parts that fit together, because both are working from the same plan.

When does the waterfall model work well?

Waterfall works well when three things are true: the requirements are stable, the team knows the technology, and the cost of a late change is high. Regulated software, such as medical, financial or aviation systems, often meets all three, which is why the model is still used there.

Stable requirements are the first test. If the customer can describe what they need in detail and that description will not change during the project, waterfall is efficient, because the team plans once and builds once. If the customer is still learning what they need, the model fights them at every step.

Known technology is the second test. When the team has built similar systems before, the design phase can predict the work accurately, and the estimates hold. With new technology, the estimates are guesses, and the plan falls apart as soon as the team learns something new.

High change cost is the third test. In a system where a change after release means re-testing, re-certifying or re-training hundreds of users, it pays to get the design right first. In a web app where a change ships in an hour, that caution costs more than it saves.

Waterfall vs agile: how do you choose?

Waterfall and agile answer the same question differently: how much should you decide before you start building? Waterfall decides most things up front; agile decides a little at a time and learns from each release. The table compares them on the points that usually decide the choice.

QuestionWaterfallAgile
RequirementsFixed before buildingChange as you learn
DeliveryOne release at the endSmall releases, often
Customer sees itAt the end, mostlyEvery few weeks
Change costHigh, late changes hurtLower, planned in
Best forStable, regulated workNew products, learning

The choice is not about which method is better in general. It is about how stable the requirements are and how expensive a late change is. A team that picks waterfall for a new consumer app will spend months building something users may not want; a team that picks agile for a regulated medical device will struggle to produce the documents the regulator asks for.

Many teams mix the two: waterfall for the parts that are fixed, such as a payment flow with set rules, and agile for the parts that are still being learned, such as the user interface. For the agile side, what agile software development is explains the iterative approach and its roles.

How to run a waterfall project, step by step

Running a waterfall project is mostly about discipline at the phase boundaries: each phase ends with a review, and the next does not start until it is signed off.

  1. Write the requirements with users. Interview the people who will use the software and watch them do the work today, then write down what it must do in their words. Get the document signed off before design starts.
  2. Design before you code. Draw the architecture, the screens and the data model, and review them with the team. Fix design problems on paper, where they are cheap, not in code.
  3. Build in small, testable parts. Split the code into parts that match the design, and test each part as it is written. A part never tested alone is a part that fails at the end.
  4. Test against the requirements. Write a test for every requirement in the original document, and run them all before delivery. A test that does not trace back to a requirement tests the wrong thing.
  5. Review at each boundary. Hold a short review at the end of every phase, with the people who signed off the last one. Do not start the next phase until it is done.
  6. Deliver and support. Plan the handover: user training, documentation and a named person for the first month of support. A delivery without support fails quietly.

For the implementation detail of each phase, how to implement the software development life cycle covers the same steps with the tooling and ownership.

Example (hypothetical): a compliance reporting build

Example (hypothetical): a mid-size bank needs a quarterly compliance report with a fixed format set by its regulator. The format will not change during the project, the data sources are known, and the deadline is fixed. The team chooses waterfall.

The requirements phase takes 3 weeks and produces a 40-page document listing every field, every rule and every check. The design phase takes 2 weeks and fixes the data model and the report layout. Building takes 6 weeks, testing takes 2 weeks, and delivery takes 1 week, for a total of 14 weeks.

Testing finds 12 issues, and 10 of them trace back to requirements that were written unclearly, not to code errors. The team fixes the document, not only the code, so the next quarter's report starts from a correct record.

The project ships on time because the requirements never changed. The lesson is not that waterfall is better, but that a fixed-format, fixed-deadline report with known data is exactly the kind of project waterfall was made for.

What are the common mistakes?

The most common waterfall mistakes are starting design before requirements are signed off, skipping phase reviews, and using the model for work that is still being discovered.

  • Design before sign-off. If design starts while requirements are still changing, the design is built on moving ground. Wait for the signature.
  • Skipping phase reviews. A review that is skipped is a decision that is never checked. Hold the review, even if it is short.
  • Testing only at the end. Testing each part as it is written catches problems early. Waiting until the end means finding them all at once, when they are hardest to fix.
  • Using waterfall for discovery. If the customer is still learning what they need, waterfall will freeze the wrong requirements. Use an iterative method instead.
  • Treating the document as the product. A perfect requirements document that nobody reads is worthless. The document must be short enough to read and clear enough to test against.
  • No change process. Requirements do change, even in waterfall. Without a written change process, every change becomes an argument instead of a decision.

For a direct comparison of the two approaches, agile vs scrum in project management explains how iterative teams organise the same work differently.

Key takeaways

  • Waterfall runs in fixed phases, each finished and reviewed before the next one starts.
  • It works best when requirements are stable, the technology is known and late changes are expensive.
  • Requirements are the phase that matters most; a missing need is only found when users see the finished software.
  • Test each part as it is written, and test the whole system against the original requirements document.
  • Use an iterative method instead when the customer is still learning what they need.

Frequently asked questions

Is the waterfall model still used today?

Yes, mainly in regulated work such as medical, financial and aviation software, where requirements are stable and a late change is expensive. Most new consumer products use iterative methods instead, because their requirements change as teams learn.

What are the five phases of waterfall?

The classic phases are requirements, design, implementation, testing and deployment. Each phase produces a result the next phase depends on, and each ends with a review before the next phase starts.

What is the biggest weakness of waterfall?

Late feedback. Users usually see the software near the end, so a missing or wrong requirement is found when it is most expensive to fix. That is why the requirements phase needs the most time and the most user involvement.

When should I choose waterfall over agile?

Choose waterfall when requirements are stable, the technology is known and late changes are costly, such as in regulated or fixed-format work. Choose agile when the customer is still learning what they need and the product will change.

Can you mix waterfall and agile?

Yes, many teams do. They use waterfall for the fixed parts, such as a payment flow with set rules, and agile for the parts still being learned, such as the user interface. The mix needs clear boundaries between the two parts.

How long does a waterfall project take?

It depends on the size, but a small system can take three to four months across the five phases. The requirements and design phases usually take a third of the time, because decisions made there are the cheapest to get right.

Found this useful? Share it.
Hertiv engineering team

Written from projects we build for clients: AI and agent systems in production. Every post is reviewed by a senior engineer before publishing and updated when practice changes.

About HertivHow we work

Planning a software build with fixed requirements? Talk to Hertiv.

A senior engineer replies within one business day. Or see our Custom Software Development service.

Book a free call

Keep reading

All posts

Tell us what you want to build

A senior engineer reads every request and replies within one business day with questions, a rough range, or a call link.

  • NDA on request before any details
  • You own all code, models and IP
  • US, UK and EU time-zone overlap

Your email app should open with your message ready to send. If it does not, write to [email protected].

Prefer email? Write to [email protected]
Estimate costBook a call