What Is Scrum Methodology, and How Does It Work?

Scrum builds software in fixed sprints of one to four weeks, with clear roles, daily standups and a demo at the end. Learn the roles, events and first-sprint plan.

Hertiv engineering teamReviewed by a senior engineer
7 min read
What Is Scrum Methodology, and How Does It Work?
On this page

Short answer

Scrum methodology is a way of building software in short, fixed cycles called sprints, where a small team plans a small piece of work, builds it, shows it to users, and plans the next piece. Three roles, five events and three artefacts keep the work visible and the rhythm fixed.

What is Scrum methodology?

Scrum methodology is a way of building software in short, fixed cycles called sprints, where a small team plans a small piece of work, builds it, shows it to users, and then plans the next piece. It is the most widely used form of agile working, and it suits products that change as they are built.

The idea is simple: instead of writing a full plan for a year and building everything before anyone sees it, the team works in cycles of one to four weeks and delivers something usable at the end of each cycle. Each cycle gives real feedback, and that feedback shapes the next cycle.

Scrum elementWhat it isHow often
SprintA fixed work cycle of 1-4 weeksEvery sprint
Product backlogThe ordered list of all work wantedUpdated daily
Sprint backlogThe work chosen for this sprintOnce per sprint
Daily standupA 15-minute team check-inEvery working day
Sprint reviewA demo of finished workEnd of each sprint
RetrospectiveA review of how the team workedEnd of each sprint

Scrum does not tell a team what to build. It tells the team how to organise the building: who decides what matters, how work is chosen, and how the team checks its own progress. For how Scrum differs from other agile methods, see agile vs Scrum.

What are the Scrum roles?

Scrum has three roles, and each one has a clear job. The product owner decides what matters most and owns the product backlog. The Scrum master keeps the process running and removes blocks. The developers build the work and decide how to do it.

The product owner is the single person who can say yes or no to a piece of work. That sounds like a lot of power, but it is what keeps the backlog honest: when one person owns the order, the team never has to guess which request matters most. A good product owner talks to users every week, not just at launch.

The Scrum master is not a manager and does not assign tasks. The job is to run the meetings, protect the team from interruptions during a sprint, and help the team fix whatever slows it down. In many small teams, a developer takes this role part-time.

Developers in Scrum means everyone who builds the product: programmers, designers and testers. The team is small, usually three to nine people, and it manages its own work. Nobody outside the team tells a developer which ticket to pick up next; the team chooses together. For the wider method behind these roles, see agile software development.

What happens in a sprint?

A sprint is a fixed cycle, usually two weeks, with the same five events every time. The sprint starts with planning, runs with daily standups, and ends with a review and a retrospective. The dates do not move, even if the work is not finished.

Sprint planning takes a few hours on the first day. The product owner presents the most important items from the backlog, the team asks questions, and the team chooses how much it can finish in the sprint. The chosen items become the sprint backlog, and the team agrees a sprint goal in one sentence.

During the sprint, the team holds a 15-minute daily standup. Each person says what they finished, what they will do next, and what is blocking them. The standup is a planning meeting, not a status report to a manager, so it stays short and stays about the work.

At the end, the team demos the finished work in the sprint review, and then holds a retrospective to agree one or two changes to how it works. Unfinished items go back to the backlog, and the next sprint starts with fresh planning. The fixed rhythm is what makes Scrum predictable: stakeholders know when they will see progress, and the team knows when it can rest and reset.

What are the Scrum artefacts?

Scrum artefacts are the three lists and boards that make the work visible. The product backlog holds everything wanted, the sprint backlog holds what the team chose for this sprint, and the increment is the finished, usable work at the end of the sprint.

The product backlog is ordered by value, not by date. The most valuable item sits at the top, and the team refines the top items so they are small enough to build in a sprint. Items further down can stay vague, since they may change or be dropped before the team reaches them.

The sprint backlog is the team's own plan. It lists the chosen items plus the tasks the team needs to finish them, and the team updates it every day as work moves. A burndown chart, which shows work left against days left, is the usual way to see whether the sprint is on track.

The increment is the part people forget. It is not a demo or a draft: it is working software that meets the team's definition of done, which usually means built, tested and ready to ship. If the increment is not usable, the sprint did not really finish, even if every ticket is marked closed. For scoping a first version that can ship, see what an MVP is.

How do you run your first sprint?

You run your first sprint by keeping it small and keeping the rhythm, not by getting every detail right. A team that plans a two-week sprint, holds daily standups and demos something at the end has already done Scrum, even if the first sprint is rough.

  1. Write the backlog. List the ten most important things the product must do, in plain language, and put the most valuable first.
  2. Pick a sprint length. Two weeks is the usual start, and it stays fixed for the next few sprints.
  3. Hold planning. Choose the items the team can finish in two weeks, and write a one-sentence sprint goal.
  4. Work in the open. Use one board that everyone can see, and move items as they change state.
  5. Meet daily for 15 minutes. Same time, same place, and only the three questions: done, next, blocked.
  6. Demo at the end. Show working software to real users or stakeholders, and write down what they say.
  7. Hold a retrospective. Pick one thing to keep and one thing to change, and write both down.

The first sprint will feel slow, and that is normal. The team is learning to estimate, to demo and to say no to extra work. Most teams need three or four sprints before the rhythm feels natural, and the retrospective is what makes each one better than the last.

Example (hypothetical): a team ships its first sprint

Example (hypothetical): a team of six people builds a booking app for a small clinic. They choose a two-week sprint, which is ten working days, and they plan 40 story points of work, where one point is roughly half a day of work for one person.

Each morning the team meets for 15 minutes, so each person spends 150 minutes in standups over the sprint, which is two and a half hours. The team finishes 34 of the 40 points, and the six unfinished points go back to the backlog. Their velocity, the work they finish per sprint, is now 34 points.

At the review, the team demos a booking form that takes a name, a date and a time, and stores the booking. The clinic owner asks for a cancel button, which goes to the top of the backlog. At the retrospective, the team agrees to split large items before planning, since the six unfinished points all came from one item that was too big.

For the second sprint, the team plans 34 points, matching its measured velocity instead of guessing 40 again. The booking form ships, the cancel button is built, and the team has a number it can trust for the next plan. That is the whole point of Scrum: a small, honest measure of what the team can actually do.

What are the common mistakes?

The most common Scrum mistakes are treating the sprint as a deadline, skipping the retrospective, and letting the backlog grow without ordering it. Each one turns Scrum into a set of meetings with no real rhythm.

  • Moving sprint dates. If the sprint end moves, the rhythm breaks and nothing is ever really finished.
  • Skipping the retrospective. Without it, the same problems repeat every sprint.
  • No single product owner. When three people can reorder the backlog, the team builds the loudest request, not the most valuable.
  • Counting started work as done. Only the tested, usable increment counts.
  • Standups that run long. A 15-minute check-in that becomes a 45-minute discussion eats the day.
  • Planning more than the last velocity. Hope is not a plan; last sprint's finished points are.

Key takeaways

  • Scrum works in fixed sprints of one to four weeks, with a demo at the end of each
  • The product owner orders the work, the Scrum master runs the process, developers build it
  • A sprint has five events: planning, daily standups, review and retrospective
  • Only finished, tested, usable work counts as the increment
  • Plan the next sprint from the last sprint's finished points, not from hope

Frequently asked questions

How long should a sprint be?

Two weeks is the usual start, and most teams keep it fixed for several sprints. One-week sprints suit fast-changing work, while four-week sprints suit larger items, but changing the length every sprint breaks the rhythm the team relies on.

Is Scrum the same as agile?

No. Agile is the wider idea that software should be built in small steps with frequent feedback. Scrum is one specific method for doing agile, with fixed roles, events and artefacts that other agile methods do not all share.

Who should be the product owner?

One person who talks to users, understands the business, and can say yes or no to a piece of work. A committee cannot own a backlog, because the team needs one clear order of what matters most.

What if work is not finished at the end of a sprint?

It goes back to the product backlog, and the team plans it again in the next sprint. The sprint dates do not move, and the unfinished work does not count toward the team's velocity.

Can Scrum work for a team of two?

Yes, with the roles shared. One person can be product owner and Scrum master, but the team still needs a backlog, a fixed sprint length, daily check-ins and a demo, or the rhythm disappears.

Do you need special software to run Scrum?

No. A board with columns for to do, doing and done is enough to start, whether it is a wall of sticky notes or a simple online board. The tool matters far less than the habit of updating it daily.

Found this useful? Share it.
Hertiv engineering team

Written from projects we build for clients: software products in production. Every post is reviewed by a senior engineer before publishing and updated when practice changes.

About HertivHow we work

Starting a new product team?

A senior engineer replies within one business day. Or see our Custom Software Development service.

Book a free call

Keep reading

All posts

Tell us what you want to build

A senior engineer reads every request and replies within one business day with questions, a rough range, or a call link.

  • NDA on request before any details
  • You own all code, models and IP
  • US, UK and EU time-zone overlap

Your email app should open with your message ready to send. If it does not, write to [email protected].

Prefer email? Write to [email protected]
Estimate costBook a call