What Does It Cost to Build an Android App?
An Android app costs what its design, build, testing and launch add up to. Here is how to read a quote, what drives the price and where first versions usually land.
On this page
Short answer
The cost of building an Android app is the sum of design, development, testing and launch work, and it depends mostly on how many features the first version has and how long the team needs. A simple app with a few screens costs far less than an app with accounts, payments and offline data.
What does an Android app cost to build?
Android app development cost is the total price of designing, building, testing and launching an app for Android phones and tablets. It covers the people who do the work, the tools they use and the time the work takes. The number you are quoted should include all four parts, not just the coding.
Quotes vary widely because apps vary widely. A simple app with five screens and no accounts costs far less than an app with logins, payments, maps and offline data. The size of the team and where the team is based also change the price, which is why two quotes for the same idea can look very different.
The first step is to fix the scope of the first version. A clear list of features lets every team quote the same job, and it keeps the price from growing during the build. Read what an MVP is before you ask for quotes, so the first version stays small on purpose.
What sets the price of an Android app?
Six factors set most of the price. The table below lists each one and what it adds to the bill.
| Factor | What it adds | How to keep it down |
|---|---|---|
| Feature set | Screens, accounts, payments, maps | Cut the first version to one core job |
| Design | Layouts, icons, animations | Use Material Design parts as they are |
| Backend and data | Servers, databases, sync | Start with a simple backend |
| Integrations | Payments, maps, chat | Add one integration at a time |
| Testing | Devices, Android versions, fixes | Test on the most common devices first |
| Launch and store | Store listing, review fixes | Budget time for the first review round |
Design and testing are the two costs teams most often leave out. Android runs on many screen sizes and versions, so an app that looks right on one phone can break on another. Testing on a short list of common devices catches most of that before users do.
What should the first version include?
The first version should do one job well. Pick the action your users will do most often, such as booking, ordering or tracking, and build that first. Everything else can wait for the second version, when you know what users actually ask for.
A short feature list keeps the price down and the launch date close. It also makes the app easier to test, because there are fewer screens and fewer ways for things to break. Most failed first versions fail because they try to do too much at once.
Write the list down before you talk to a team. A written list stops the scope from growing during the build, which is the most common reason a fixed quote turns into an open bill. The steps to validate an app idea help you test the list with real users first.
- One core job. The action users will do most often, done well.
- Accounts. Sign-in and a basic profile, nothing more.
- One payment method. Add more only after the first sales come in.
- Settings and help. A simple settings screen and a way to contact you.
Who builds it, and how long does it take?
A small Android app is usually built by three to five people: a designer, one or two developers, a tester and a project lead. Larger apps add a backend developer and a second tester. The team shape matters more than the team size, because a missing tester shows up as bugs after launch.
| App size | Team | Typical timeline |
|---|---|---|
| Simple | 2-3 people | 6-10 weeks |
| Standard | 3-5 people | 3-5 months |
| Complex | 5-8 people | 5-9 months |
Timelines slip most often at two points: design approval and store review. Design approval slips when nobody owns the final say, so name one person who approves screens. Store review usually takes a few days, but a rejection can add a week, so run the mobile app development checklist before you submit.
What does it cost after launch?
Launch is not the end of the cost. An app needs hosting for its backend, fixes for new Android versions, and small changes when users report problems. A common planning figure is 15 to 20 percent of the build cost per year, set aside for upkeep and small improvements.
Store fees are small next to upkeep. Google charges a one-time fee for a developer account and takes a share of paid app and in-app purchase revenue. The bigger running cost is usually the backend: servers, databases and any paid services the app calls, such as maps or messaging.
Plan the first year of running costs before you sign the build. An app that nobody can afford to maintain goes stale within a year, and users leave when an app stops working on new phones.
Example (hypothetical): a clinic booking app
Example (hypothetical): a small clinic wants an Android app so patients can book appointments, see their visit history and get reminders. The first version has booking, reminders, a patient profile and a simple admin screen for staff.
The team is four people: a designer, two developers and a tester. They work 160 hours each per month at $65 per hour, which is 4 times 160 times $65, or $41,600 per month. The build takes four months, so the team cost is $166,400. Design work adds $10,000 and testing adds $8,000, which brings the total to $184,400.
A 15 percent reserve for changes and fixes adds $27,660, so the full planning figure is $212,060. The reserve is not padding; it covers the small changes every first version needs once real patients start using it.
What are the common mistakes?
The most common mistakes are starting without a feature list, skipping device testing, and forgetting the running costs.
- No written feature list. The scope grows during the build and the price grows with it.
- Testing on one phone only. The app breaks on other screen sizes and Android versions.
- No budget for year one. The app goes stale because nobody pays for upkeep.
- Comparing quotes with different scopes. Two teams quote two different apps.
- Skipping the store review step. A rejection at the end adds a week or more.
Get the scope in writing, test on the devices your users actually own, and set aside money for the first year. A short planning step before the build saves more money than any discount on the build itself.
Key takeaways
- Android app cost is the sum of design, build, testing and launch work
- Feature set, design, backend, integrations, testing and launch set the price
- The first version should do one core job well and nothing more
- A standard app takes 3-5 people and 3-5 months to build
- Budget 15-20 percent of the build cost per year for upkeep
Frequently asked questions
How much does a simple Android app cost to build?
A simple Android app with a few screens and no accounts costs far less than an app with logins, payments and offline data. The exact figure depends on the team rate and the timeline, so ask teams to quote the same written feature list and compare the quotes side by side.
Why do Android app quotes differ so much?
Quotes differ because teams quote different scopes, different team sizes and different rates. A quote that leaves out design, testing or the backend will look cheaper but cost more later. Ask each team to list what is included and what is not.
Does an Android app cost more than an iOS app?
Not always. A single-platform Android app and a single-platform iOS app of the same size cost roughly the same to build. The difference comes from testing: Android runs on more devices and versions, so testing takes more time.
What is the cheapest way to build an Android app?
The cheapest route is a small first version with one core job, standard Material Design parts and a simple backend. Cutting features beats cutting testing, because untested apps cost more in fixes after launch than they save during the build.
Do I pay Google to publish an Android app?
Yes, Google charges a one-time fee for a developer account, and takes a share of paid app and in-app purchase revenue. The store fee is small next to the build and upkeep costs, so it should not drive your budget decisions.
How long does it take to build an Android app?
A simple app takes 6-10 weeks, a standard app takes 3-5 months and a complex app takes 5-9 months. Design approval and store review are the two points where timelines slip most often, so plan for both.