Book a free call

How to Choose an Agency for Custom AI Software in Manufacturing

A practical guide to picking an agency for custom AI software in manufacturing: what to look for, what to ask, and how to scope a first project that reaches the plant floor.

Hertiv engineering teamReviewed by a senior engineer
6 min read
How to Choose an Agency for Custom AI Software in Manufacturing
On this page

Short answer

Choose an agency for custom AI software in manufacturing by testing whether it understands your production data, OT systems and safety constraints, not just model training. Ask for a scoped proof of concept on real plant data, clear ownership of code and models, and a plan for deployment and monitoring inside your environment.

What does an agency for custom AI software in manufacturing actually do?

An agency for custom AI software in manufacturing designs and builds AI features around your production, quality and supply data, then deploys and maintains them in your environment. That can mean a vision model that catches defects, a copilot that answers questions from maintenance logs, or an agent that handles supplier documents.

The work is broader than model building. A capable team handles data extraction from machines and historians, integration with MES, ERP and quality systems, deployment on your cloud or on-premise infrastructure, and monitoring once the system is live. It also has to respect plant realities: network segmentation between IT and OT, shift-based workflows, and safety rules that no model is allowed to override.

Manufacturing AI also tends to be narrow. A single inspection station or one document-heavy process is often a better first target than a plant-wide platform. The agency's job is to help you pick that target and deliver something that operates reliably, not to sell a broad transformation programme.

Hertiv's work on AI for manufacturing is organised around this kind of narrow, deployable scope.

Which capabilities should you check before shortlisting agencies?

Check four things: industrial data experience, deployed software skills, integration ability and post-launch support. Most agencies are strong in one or two and weak in the rest.

Use this table to structure your shortlist and your first conversations.

Capability What to look for What weak answers sound like
Industrial data Experience with historians, sensor data, MES, ERP and quality records "We can work with any data" with no detail on extraction
Applied AI Computer vision, document AI, retrieval and agent workflows, not only chat demos Only generative text demos, no evaluation approach
Integration APIs, PLC and OT data gateways, on-premise or edge deployment Cloud-only assumptions for a segmented plant network
Engineering discipline Version control, testing, monitoring, CI/CD Slideware with no deployment plan
Ownership You own code, models, prompts and data Licensing tied to the agency
Support Named on-call plan and a road map for handover "We can support you later" with no terms

For a first project, general software craft matters as much as AI depth. A team that writes production-grade services and understands custom software development will usually deliver a more stable AI system than a pure research group.

How should you test an agency before signing a large contract?

Run a small paid proof of concept on your own data with a fixed scope and a fixed end date. This is the single most reliable filter.

Define the test around one measurable question. For example: can a vision model flag surface defects at one inspection point with an error rate your quality team accepts? Can a retrieval system answer maintenance questions correctly from five years of logs? Give the agency a sample of real data, a short window of a few weeks, and a clear success criterion agreed in advance.

During the proof of concept, watch how the team behaves rather than only what it builds:

  • Does it ask about your data quality and label availability early?
  • Does it show evaluation results, not just a demo video?
  • Does it explain failure modes in plain language?
  • Does it document the code so your engineers can read it?

A short, well-defined pilot is a normal way to start. Hertiv runs a structured AI proof of concept development in four weeks format that follows this pattern.

What should the contract cover?

The contract should fix ownership, access, hosting, acceptance criteria and support before work begins. Ambiguity here causes most of the disputes that follow.

Cover these points explicitly:

  • Ownership: you own the source code, model artefacts, prompts, configuration and data derived from your operations.
  • Data handling: what data leaves your environment, where it is stored, and how it is deleted.
  • Hosting: cloud, on-premise or edge, and who operates it.
  • Acceptance: concrete criteria tied to the proof of concept results, not subjective sign-off.
  • Change control: how scope changes are priced and approved.
  • Support and handover: documentation, training and a named support period.

Ask also how the agency will handle model changes after launch. Models and prompts drift, data shifts, and a system that worked in spring may underperform by autumn. A support plan that includes monitoring and periodic re-evaluation is part of the product, not an extra.

How do you protect plant data and operational systems?

Protect plant data by keeping sensitive data inside your network, limiting what the agency can access, and treating model endpoints as any other production system. AI does not remove your existing security obligations.

Practical controls include:

  • Give the agency access to a masked or sampled dataset first, then expand access only as needed.
  • Keep IT and OT networks separated; let the AI system read through approved gateways rather than direct machine connections.
  • Log every model call and every agent action, especially where an agent can trigger a workflow.
  • Require a clear answer on whether production data is used to train vendor models.

Security questions belong in the first meeting, not the final review. An agency that treats them as an afterthought will produce a system that your security team blocks at deployment. Readiness for this kind of review is worth checking early, for example through an AI readiness assessment in three weeks or a dedicated security review of the proposed architecture.

What does a sensible first project look like?

A sensible first project is narrow, measurable and connected to a real operational pain, with a clear owner inside the plant. It should be small enough to deliver in weeks and important enough that people will use it.

Example (hypothetical): a plant has three manual inspection stations and wants to reduce rework. A first project targets one station, uses existing camera footage, and aims to flag a specific defect class for human review. The quality team agrees on an acceptance threshold before work starts.

If the pilot meets it, the same pattern extends to the other two stations; if it does not, the plant has spent a few weeks rather than a year learning that the data was not ready.

Common mistakes at this stage:

  • Starting with a broad "AI platform" instead of one workflow.
  • Skipping the data audit, then discovering labels are missing.
  • Choosing a target no one owns operationally.
  • Ignoring the people who will use the tool on shift.

A good first project leaves you with working software, documented code and a data set you can reuse.

How to choose: a short checklist

Choose by evidence from a scoped pilot, not by presentations. Work through these steps in order.

  1. Define the problem and the owner. Name the process, the metric and the internal person accountable for it.
  2. Audit the data. Confirm what data exists, in what format, and whether labels are available before you talk to agencies.
  3. Shortlist on evidence. Ask each agency for a worked example of a deployed system, with the constraints it had to meet.
  4. Run a paid pilot. Fix scope, data, timeline and acceptance criteria in writing.
  5. Decide on the pilot result. Extend, adjust or stop based on measured outcomes.

When the first system works, agent-based workflows are a natural next step for procurement, operations and support. Hertiv builds these through agentic AI development and can extend the same data foundation across departments.

Key takeaways

  • Manufacturing AI fails when the agency cannot reach plant-floor data or ignores OT and safety constraints
  • Demand a small paid proof of concept on your own data before any larger commitment
  • Check who owns the code, models and prompts, and where they will run
  • Ask how the solution will be monitored after launch and who is on call
  • Prefer teams that pair AI engineers with people who understand industrial operations
  • Get explicit answers on hosting, data residency and integration with PLC, MES and ERP systems

Frequently asked questions

How much does custom AI software for manufacturing cost?

Costs vary widely by scope. A small proof of concept on one process is typically a modest fixed fee, while a deployed system integrated with MES or ERP and supported over time costs substantially more. Ask for a fixed-scope pilot price first, then plan the larger build once results are known.

How long does a first manufacturing AI project take?

A focused proof of concept usually takes a few weeks, assuming data access is ready. A production deployment with integration, testing and operator training typically takes a few months. Timelines stretch mainly when data is scattered or labels are missing.

Do we need our data labelled before starting?

Not always, but you need to know what labelling is required. Some projects can start with existing inspection records or maintenance logs. Others need a labelled sample before any model can be evaluated. A short data audit before the pilot resolves this.

Can AI software run on-premise in a plant?

Yes. Many manufacturing systems run on-premise or at the edge because of network segmentation and latency needs. Confirm the agency can deploy and monitor in that setup, not only in its own cloud account.

Who owns the models and code?

You should. Insist in the contract that source code, model artefacts, prompts and configuration are yours, and that any third-party licences are disclosed up front. Ownership questions are much harder to resolve after delivery.

What happens after the pilot succeeds?

You move to a scoped build with integration, monitoring and operator training, then extend the pattern to similar processes. Keep the acceptance criteria from the pilot as the baseline for the larger deployment so quality does not slip.

Found this useful? Share it.
Hertiv engineering team

Written from projects we build for clients: AI and agent systems in production. Every post is reviewed by a senior engineer before publishing and updated when practice changes.

About HertivHow we work

Planning custom AI software for a plant or production line? Talk to Hertiv about scoping a pilot.

A senior engineer replies within one business day. Or see our AI POC Development service.

Book a free call

Keep reading

All posts

Tell us what you want to build

A senior engineer reads every request and replies within one business day with questions, a rough range, or a call link.

  • NDA on request before any details
  • You own all code, models and IP
  • US, UK and EU time-zone overlap

Your email app should open with your message ready to send. If it does not, write to [email protected].

Prefer email? Write to [email protected]
Estimate costBook a call